Instructions for Maintaining the ATOM Shake Table in a Lab Environment

Shake table testing equipment for "Pre-training Meeting Preparation List for Shake Table Setup"

Storage and Dust Protection:

  • Covering: Always cover the ATOM shake table with a suitable dust cover when it is not in use. This will prevent dust accumulation on the table and its components.
  • Hardcase Storage: For extended periods of non-use, or when additional protection is needed, store the shake table in the hardcase provided. Ensure that the table is clean and dry before placing it inside the case.
Shake table testing equipment for "Instructions for Maintaining the ATOM Shake Table in a Lab Environment"

Rail Maintenance:

  • Cleaning: Regularly clean the rails of the shake table to remove dust and debris. Use a soft, dry cloth or a brush specifically designed for delicate electronics.
  • Inspection: Periodically check the rails for any signs of wear or damage. Promptly address any issues to maintain optimal performance.
  • Lubrication: Apply a minimal amount of rail lubricant if the rails appear dry.

Power Management:

  • Turning Off: Always turn off the ATOM shake table from the power source when not in use. This conserves energy and reduces the risk of electrical issues.
  • Cable Care: Regularly inspect power cables and connections for any signs of damage or wear. Replace damaged cables immediately to ensure safe and reliable operation.

Climate Control:

  • Humidity and Temperature: Store the shake table in a climate-controlled area where high humidity does not exist. Ideal storage conditions should maintain a consistent temperature and low humidity to prevent moisture damage and corrosion.

Safety Precautions:

  • Protective Gear: Always wear safety glasses and gloves when operating the shake table to protect against potential hazards like flying debris or sharp edges.
  • Keep Hands Clear: Ensure that hands and other objects are kept clear of the shake table during operation to avoid injury.
  • Warning Signs: Display clear warning signs around the shake table area to remind users of operational hazards and safety practices.
  • Mounting: It is highly advisable to securely mount the shake table to stable ground prior to operation.

Additional Recommendations:

  • Ventilation: Ensure that the storage and operation area is well-ventilated. Adequate air-flow helps prevent the buildup of condensation and dust.
  • Routine Checks: Schedule regular maintenance checks to ensure all components of the shake table are functioning correctly. This includes testing the functionality of the table after periods of storage.
  • Usage Log: Maintain a usage log to track operation hours and maintenance activities. This can help predict wear patterns and schedule preventive maintenance.
  • Training: Ensure that all personnel who operate the shake table are properly trained on its use and maintenance procedures. Proper training reduces the risk of misuse and accidents.

By adhering to these guidelines, you can significantly extend the life and performance of your ATOM shake table and ensure it operates safely and effectively in your lab environment.

Questions?

Email us at support@quakelogic.net or call us at +1-916-899-0391.

Last reviewed: 2026-07-04

Executive Summary

Shake tables reproduce controlled motion in the laboratory so engineers can evaluate components, assemblies, soil boxes, and structural models under seismic inputs. This article has been expanded as an engineering resource for readers evaluating shake tables concepts, instrumentation choices, and monitoring workflows. The discussion is educational and should be paired with project-specific review by qualified engineers, applicable codes, owner requirements, and equipment documentation.

Key Takeaways

  • Define the engineering objective before selecting sensors, test equipment, trigger thresholds, or reporting workflows.
  • Use calibrated instrumentation, documented installation practices, time synchronization, and traceable data handling where measurement quality matters.
  • Interpret measured data in context: site conditions, structure type, noise environment, sampling rate, bandwidth, and boundary conditions all affect conclusions.
  • Use authoritative references and project-specific criteria rather than relying on generic thresholds or unsupported performance claims.

Technical Explanation

In practical shake tables work, the engineering system is more than a sensor or a test platform. A credible workflow includes the measurement objective, instrument selection, mounting or boundary conditions, sampling and timing strategy, data validation, event or response detection, engineering review, and reporting. Weakness in any part of that chain can reduce confidence in the final interpretation.

For monitoring applications, engineers should document sensor orientation, coupling, environmental exposure, dynamic range, frequency bandwidth, data logger configuration, clock synchronization, communications, and maintenance procedures. For testing applications, engineers should document input motion, fixture design, payload properties, control limits, safety interlocks, acceptance criteria, and post-test data review.

Engineering Applications

ApplicationEngineering QuestionTypical Evidence Needed
Research and educationHow does a structure, component, or sensor respond under controlled conditions?Test plan, calibrated data, input motion, boundary conditions, and repeatable observations.
Critical infrastructureIs the asset response normal, changing, or potentially unsafe after an event?Baseline data, event records, thresholds, inspection workflow, and engineering sign-off.
Industrial facilitiesCan monitoring support operational continuity and response decisions?Site-specific criteria, reliable telemetry, alarm logic, maintenance records, and documented procedures.

People Also Ask

What should be specified before buying equipment?

Specify the measurement objective, frequency range, amplitude range, environment, data format, timing needs, installation constraints, reporting requirements, and applicable standards or owner criteria.

Why do references and standards matter?

They provide terminology, acceptance criteria, test methods, and documentation expectations. They do not replace engineering judgment, but they reduce ambiguity and make results easier to review.

How should data quality be checked?

Review calibration status, timing, clipping, sensor orientation, signal-to-noise ratio, environmental artifacts, data completeness, and whether the record supports the engineering decision being made.

Related QuakeLogic Resources

References

Recommended Diagram or Download

Media placeholder: Add an original diagram showing the measurement chain from sensor or test platform to data acquisition, analysis, engineering interpretation, and reporting. Where this article becomes a buyer guide or application note, create a downloadable PDF version after engineering review.

Discuss a Monitoring or Testing Application

QuakeLogic supports seismic monitoring, earthquake early warning, structural health monitoring, infrasound monitoring, vibration monitoring, data acquisition, and shake table testing applications. For project-specific guidance, contact QuakeLogic with the asset type, measurement objective, site constraints, and required deliverables.

Pre-training Meeting Preparation List for Shake Table Setup

QuakeLogic biaxial shake table connected to a laptop running EASYTEST control software

In short: Before QuakeLogic shake table training, install EASYTEST and the 32-bit LabVIEW 2015 SP1 runtime on a Windows 10 or newer PC, wire the step-up transformer from 110 V to 220 V where needed, and connect the PC to the table over a built-in Ethernet port with static IP 192.168.2.5 and subnet 255.255.255.0. Ping the table's IP, then enter the stroke, encoder and maximum speed values printed on the servo motor.

In this tutorial, we provide a step-by-step pre-training meeting preparation checklist for setting up the shake table effectively. Covering software installation, hardware setup, networking configuration, and safety precautions, this guide ensures a smooth setup process for users. Emphasizing the importance of familiarity with the user manual, software training resources, and troubleshooting plans, this tutorial equips users with the knowledge and tools needed to operate the shake table safely and efficiently. Whether you’re new to using the shake table or seeking to refresh your setup procedures, this guide offers valuable insights and practical tips for success.

Shake table testing equipment for "Pre-training Meeting Preparation List for Shake Table Setup"

Software Installation

  • Download the EASYTEST software from the provided link sent to you in a separate email
  • Ensure the Windows OS (Windows 10 or above) is installed on the designated laptop or desktop.
  • Download and install the LabView runtime engine for 2015 SP1 (32-bit version) if not already installed.
  • Download ANYDESK software (optional) in case if one of our team members needs to connect your computer remotely for configuration checks. ANYDESK software is available HERE.

Hardware Setup

  • Connect the transformer to a 110-volt power source. (For countries which use 110-volt only)
  • Plug the transformer into the shake table’s power input to convert the voltage to 220 volts. (For countries which use 110-volt only)
  • Ensure proper grounding of all equipment to prevent electrical hazards.

IMPORTANT:

If your country operates on 110 volts, ensure that the back of the step-up transformer is set to 110-volt input. Then, plug the shake table’s power cable into the 220-volt output at the front of the transformer. Failing to follow these instructions could result in the shake table not functioning.

transformer 0 1 for "Pre-training Meeting Preparation List for Shake Table Setup"
transformer 1 for "Pre-training Meeting Preparation List for Shake Table Setup"

Networking Setup

  • Ensure the laptop or desktop running the shake table software has a dedicated Ethernet port. IMPORTANT NOTE: DO NOT USE A USB TO ETHERNER ADAPTOR.
  • Set up network settings on the Windows computer:
  • Static IP: 192.168.2.5
  • Subnet mask: 255.255.255.0
  • Connect an Ethernet cable from the computer to the shake table’s Ethernet port.

Testing Connectivity

  • Verify the network connection between the computer and the shake table by pinging the shake table’s IP address (e.g., 192.168.2.32). The IP address is often written on the top of the servo-motor.
  • Ensure there are no firewall or antivirus settings blocking communication between the computer and the shake table.

Entering Correct Parameters

  • When you first run the EASYTEST software, be sure to input the correct stroke value in millimeters, encoder value, and maximum speed in mm/sec. These values are typically noted on top of the servo-motor.

Training Materials

  • Review the provided YouTube link for training on using the EASYTEST shake table software.
  • Familiarize yourself with the software interface and functionalities through the provided resources.
Shake table software training video preview

Safety Precautions

  • Emphasize the importance of adhering to safety protocols outlined in the user manual.
  • Ensure all personnel involved in the setup and operation of the shake table are aware of safety procedures and equipment handling guidelines.
  • For safety, please read our related blog page HERE.

Final Checks

  • Double-check all connections, settings, and software installations before proceeding with any tests or experiments.
  • Confirm that all necessary equipment and materials are readily available for the training session.

By following this pre-training meeting preparation list, you’ll be well-equipped to set up and operate your shake table effectively. If you encounter any difficulties during the setup process, don’t hesitate to reach out to QuakeLogic’s technical support for assistance.

Questions?

Email us at support@quakelogic.net or call us at +1-916-899-0391.

Key Takeaways

  • Software: EASYTEST (link emailed), Windows 10 or above, LabVIEW 2015 SP1 32-bit runtime, optional AnyDesk for remote support.
  • Power: in 110 V countries set the step-up transformer input to 110 V and plug the table into its 220 V output; ground all equipment.
  • Network: use a built-in Ethernet port (no USB adapter), static IP 192.168.2.5, subnet 255.255.255.0.
  • Connectivity: ping the table's IP (e.g. 192.168.2.32, printed on the servo motor) and clear firewall or antivirus blocks.
  • On first run of EASYTEST, enter the stroke (mm), encoder value and maximum speed (mm/s) noted on the servo motor.

Frequently Asked Questions

What software do I need to run a QuakeLogic shake table?

You need the EASYTEST control software, downloaded from the link QuakeLogic emails you, running on a laptop or desktop with Windows 10 or above. EASYTEST depends on the LabVIEW 2015 SP1 runtime engine (32-bit), which must be installed first. AnyDesk is optional but useful if QuakeLogic support needs to connect remotely to check the configuration.

How do I set the network settings for a QuakeLogic shake table?

Use a computer with a dedicated built-in Ethernet port; USB-to-Ethernet adapters are not supported. In Windows network settings, assign the static IP 192.168.2.5 with subnet mask 255.255.255.0, then connect an Ethernet cable from the computer to the table. Verify the link by pinging the table's IP address, typically 192.168.2.32 and printed on top of the servo motor.

Does the shake table work on 110 V power?

The table runs on 220 V. In countries with 110 V mains, connect the supplied step-up transformer to a 110 V outlet, confirm the switch on the back of the transformer is set to 110 V input, and plug the table's power cable into the 220 V output on the front. Ground all equipment. If the transformer is set incorrectly, the table will not function.

What parameters must be entered in EASYTEST on first use?

When EASYTEST is first run, enter the correct stroke value in millimeters, the encoder value and the maximum speed in mm/s for your specific table. These values are normally written on top of the servo motor. Entering them correctly ensures the software limits motion to the table's physical range and commands the right speed for every test.

Why can't my computer ping the shake table?

First confirm the PC's static IP is 192.168.2.5 with subnet 255.255.255.0 and that the cable runs from a built-in Ethernet port, not a USB adapter. Then check that Windows Firewall or antivirus software is not blocking traffic to the table's address. If the ping still fails, contact QuakeLogic support at support@quakelogic.net or +1-916-899-0391.

Need help with a project? QuakeLogic designs and supplies seismic monitoring, earthquake early warning, structural health monitoring, infrasound, and shake table systems. Browse QuakeLogic products or contact our engineering team with your site, structure, or test requirements.

How to Install an Accelerograph and GPS Antenna in a Building

Accelerograph bolted to a concrete floor inside a building with GPS antenna cable routed to a window

In short: Accelerograph installation inside a building starts with a site near the structural core, away from HVAC and machinery, ideally bolted level to the floor in a NEMA enclosure with 1 ft (0.3 m) of clearance. Place the GPS antenna with a clear sky view at a window or outdoors, route its cable without sharp bends, power through a grounded surge protector, then verify GPS lock and test recording.

Overview

This guide outlines the comprehensive steps for installing an accelerograph and its accompanying GPS antenna within a building structure. It covers mounting procedures, necessary clearances, and accessibility considerations to ensure optimal performance and ease of maintenance.

Tools and Materials Required

  • Drill and drill bits
  • Mounting brackets and hardware (screws, anchors, etc.)
  • Screwdriver
  • Level
  • Measuring tape
  • Cable conduits (if necessary)
  • Sealant (for outdoor installations)

Pre-Installation Planning

  1. Location Selection: Choose a location that minimizes vibrations from non-seismic sources (e.g., heavy machinery, and HVAC systems). Ideally, the accelerograph should be positioned close to the building’s structural core. It is better to install it on the floor inside an NEMA enclosure.
  • GPS Antenna Placement: The GPS antenna requires a clear view of the sky to maintain satellite communication. It should be placed on or near a window sill or mounted externally with a clear path to the sky, avoiding obstructions such as tall buildings or heavy foliage. The GPS provides absolute timing to the instrument for time-stamping of the waveforms recorded.
  • Accessibility: Ensure the installation site is easily accessible for maintenance and data retrieval. An access panel or removable ceiling tiles are recommended for indoor installations.
  • Clearances: Maintain at least 1 foot (~0.3 meters) of clearance around the accelerograph for ventilation and to ensure unobstructed access.

Installation Steps

  1. Mounting the Accelerograph:
  • Use the measuring tape and level to mark the drill point for the mounting anchor ensuring the accelerograph will be level.
    • Drill a hole at the marked point and insert the anchor.
    • Secure the mounting anchor with a screw.
    • Attach the accelerograph to the mounting anchor following the manufacturer’s guidelines.

Example of floor mounting

In the following picture, you can see a floor-mounting installation of a unit with an internal sensor with the use of a bolt in the concrete.

accelerograph install 1 for "Installation Instructions for Accelerograph with GPS Antenna Inside a Building"

Drawing is courtesy of SARA

The leveling pads do not necessarily need the counter-lock paddle (not drawn in the figure), even if it is always good to have. They would work in a counteraction, so the paddles shall be adjusted forcing the sensor to go up, while the bolt keeps it fixed down.

accelerograph install 2 for "Installation Instructions for Accelerograph with GPS Antenna Inside a Building"

Photo is courtesy of SARA

The same principle will work for wall and ceiling installations as follows.

Example of wall mounting or ceiling

If the unit needs to be mounted in buildings, it often requires a vertical or ceiling-flipped installation. In these cases, is essential to use the central key-hole hooking slot.

accelerograph install 3 for "Installation Instructions for Accelerograph with GPS Antenna Inside a Building"

Drawing is courtesy of SARA

In both cases, especially for mounting equipment over 1 meter of elevation we absolutely recommend the use of a safety chain or steel cord.
It can be anchored to any suitable threaded hole. If necessary and appropriate you may decide to use 2 or more threaded holes to anchor the safety cord.
All safety retention devices must be checked every year. To be on the safer side a shaft or a large steel baseplate could be used instead of the use of a dowel.

Appropriate heavy-load dowel and proper bolt are necessary to anchor this way, also depending on type of material the wall is made of, concrete, bricks, etc.

The bolt head should be of 12 mm, maximum of 14 mm to allow a proper leveling degree of freedom. The diameter of bolt stem should be not less than 8 mm for wall or ceiling mounting.

NOTE – 1: It is very important to have a safety bonding for the wall and ceiling mount and check the tightness of it periodically else vibrations will be wrongly measured.

NOTE – 2: Do not overtight the feet else the case will be damaged.

  • Installing the GPS Antenna (if applicable):
  • If mounting externally, ensure the antenna is positioned securely with a clear view of the sky. Use a sealant to waterproof any drill holes.
    • For window placement, ensure the antenna is as close to the glass as possible, avoiding metal frames that might obstruct signal reception.
    • Route the antenna cable to the accelerograph, avoiding sharp bends. Use cable conduits if necessary to protect the cable from damage.
  • Cabling and Power Connection:
  • Connect the GPS antenna to the designated port on the accelerograph.
    • Ensure all cables are neatly routed and secured.
    • Connect the accelerograph to a power source, using a surge protector. Make sure that the power outlet is grounded.
  • Initial Setup:
  • Follow the manufacturer’s instructions to power on and configure the accelerograph.
    • Verify the GPS connection and perform any required calibrations.
  • Testing:
  • Conduct initial tests to ensure the accelerograph is recording data accurately.
    • Verify that the data can be retrieved and is consistent with expectations.

Post-Installation

  • Documentation: Keep a record of the installation details, including the location, date of installation, and any specific configurations.
  • Maintenance Schedule: Establish a regular maintenance schedule to inspect the accelerograph, its connections, and the surrounding area to ensure continued accuracy and performance.

Notes

  • Always refer to the manufacturer’s installation guidelines for specific instructions related to your accelerograph model.
  • Consider local building codes and regulations when installing external components.
  • For installations in areas with extreme weather conditions, additional protective measures may be required for the outdoor components.

By following these comprehensive instructions, you can ensure the successful installation of an accelerograph and its GPS antenna within a building, facilitating accurate seismic data collection and analysis.

Questions?

Email us at support@quakelogic.net or call us at +1-916-899-0391.

Key Takeaways

  • Install close to the building's structural core, away from heavy machinery and HVAC, preferably on the floor in a NEMA enclosure.
  • Keep at least 1 ft (about 0.3 m) of clearance around the unit for ventilation and access.
  • Wall or ceiling mounts use the central key-hole slot; bolt head 12 to 14 mm, bolt stem at least 8 mm, heavy-load dowel.
  • Above 1 m elevation a safety chain or steel cord is mandatory; check all retention devices every year.
  • GPS antenna needs a clear sky view for absolute timing; place it close to the window glass away from metal frames, seal outdoor drill holes.

Frequently Asked Questions

Where should an accelerograph be installed inside a building?

Install the accelerograph close to the building's structural core in a location that minimizes vibration from non-seismic sources such as heavy machinery and HVAC systems. Floor mounting inside a NEMA enclosure is preferred. Keep at least 1 ft (about 0.3 m) of clearance for ventilation and access, and choose a site reachable for maintenance, for example behind an access panel or removable ceiling tiles.

How do I mount an accelerograph on a wall or ceiling?

For wall or ceiling installation use the unit's central key-hole hooking slot with a heavy-load dowel suited to concrete or brick. The bolt head should be 12 mm (maximum 14 mm) to leave leveling freedom and the bolt stem at least 8 mm. For mounts above 1 m, attach a safety chain or steel cord to a threaded hole and inspect it yearly. Do not overtighten the feet, and keep the bonding tight so vibrations are measured correctly.

Where should the GPS antenna for an accelerograph be placed?

The GPS antenna provides absolute timing for waveform time-stamps, so it needs a clear view of the sky. Place it on or near a window sill as close to the glass as possible, away from metal frames, or mount it externally with no tall buildings or heavy foliage in the way. Seal any outdoor drill holes with sealant and route the cable to the accelerograph without sharp bends, using conduit where needed.

How are the leveling pads and floor bolt used on an accelerograph?

In a floor installation the accelerograph is fixed down by a bolt set in the concrete while the leveling pads are adjusted to push the sensor up against it, working in counteraction to level the unit. Counter-lock paddles are optional but good practice. A shaft or large steel baseplate can replace a dowel for added security. Avoid overtightening the feet, which can damage the case.

What should be done after installing an accelerograph?

After installation, power the accelerograph through a grounded outlet with a surge protector, follow the manufacturer's configuration steps, confirm the GPS connection and run any required calibration. Record test data and verify it can be retrieved and looks as expected. Document the location, date and configuration, and set a regular maintenance schedule to inspect the unit, its connections and the mounting.

Need help with a project? QuakeLogic designs and supplies seismic monitoring, earthquake early warning, structural health monitoring, infrasound, and shake table systems. Browse QuakeLogic products or contact our engineering team with your site, structure, or test requirements.